| Item | Task | Tips | Result |
| 1 | Determine the height between the floor and the Ceiling. This is important to determine the correct stair is supplied | If possible measure the height where the stair will actually be. Some house may not be accurate due to timber movement. If unsure state this on the order and take the most accurate measurement. We will supply several sized parts to allow flexibility - | (e.g. 8" or 203mm) |
| 2 | Choose the material required | Consider the type of house you are to install the stairs in . Oak and Mahogany are available - other materials to order - I may need to source the timber dependant on requirement. I will provide timber off cuts to enable you to practice varnishing or staining prior to working on the actual stair | |
| 3 | Clockwise or anticlockwise ascending | Determine the direction for ascending - Clockwise are available - Anticlockwise are made to order - please note there is only one or two days delay for anticlockwise | Clockwise Anticlockwise (Circle the one REQUIRED) |
| 4 | Thickness of the upper level floor | This is needed to determine the tread spacing for the top step - Please note this where any minor adjustment will be made - | |
| 5 | Determine the type of handrail you require | The options are cloth rope or an attractive stainless steel rope - The benefit if the stainless rope in addition to it's looks is the durability All handrail ropes need to be inserted to the top rails when finished. This is a simple operation to the predrilled stair posts. The ends come ready to be sealed at the final length with clear heat shrink tubing (shrunk to final length in the steam of a kettle) | Stainless rope Beige rope Mid Brown rope Dark Brown Rope (Circle the one REQUIRED) |